![](http://www.itec-eng.org/wp-content/uploads/2023/11/IMG_20200902_162639_503-scaled.jpg)
ITEM | DESCRIPTION |
---|---|
Name of project | Preparation of Non-Motorised Transport (NMT) Master Plan and Preliminary and Detailed Designs for Kisumu City. |
Name of Client | Kenya Urban Roads Authority (KURA) |
Financier | Government of Kenya (GoK) |
Objectives of the Project | Preparation of Non-Motorised Transport (NMT) Master Plan and Preliminary and Detailed Designs. |
Description of the Services | Creation of a Walking and Cycling Masterplan for the city. Collection and study of all relevant reports on transport and urban development projects; and compiling spatial information on existing NMT infrastructure, pedestrian networks, mass transit corridors, public transport routes, bus stops, street hierarchy and accident hotspots presented in the reports given by relevant authorities. Particular attention is given to the Comprehensive Traffic and Transportation Study, Comprehensive Mobility Plan, Multi- modal Integration plans, Comprehensive Development Plan, Parking study, Detailed Development Plan, policy initiatives and guidance as well as any other transport plans related to the study area provided by National and County Governments. All streets in the Study Area, along with their legal ROWs, should be mapped using GIS or AutoCAD. The consultant also studied other relevant reports which could inform the primary network such as disaster assessment maps, ongoing water body’s projects, solid waste management plans, etc. These engineering parameters should be mapped using the GIS platform or other illustration software. The Consultant should also identify transport system goals that are stated in these reports. |